[RFC 0085] NixOS Release Stabilization: ZHF on master, new timeline (#85)
Co-authored-by: Eelco Dolstra <edolstra@gmail.com> Co-authored-by: Ryan Mulligan <ryan@ryantm.com>
This commit is contained in:
parent
45b76f20ad
commit
aada139bf2
1 changed files with 131 additions and 0 deletions
131
rfcs/0085-nixos-release-stablization.md
Normal file
131
rfcs/0085-nixos-release-stablization.md
Normal file
|
|
@ -0,0 +1,131 @@
|
|||
---
|
||||
feature: nixos-release-stablization
|
||||
start-date: 2021-01-17
|
||||
author: Jonathan Ringer (@jonringer)
|
||||
co-authors:
|
||||
shepherd-team: @ryantm, @garbas, @Mic92
|
||||
shepherd-leader: @ryantm
|
||||
related-issues: [NixOS release schedule](https://github.com/NixOS/rfcs/pull/80)
|
||||
---
|
||||
|
||||
# Summary
|
||||
[summary]: #summary
|
||||
|
||||
To bring more certainty to the release cycle, add short periods where
|
||||
breaking changes are partially restricted. A list of Release Critical
|
||||
Packages is defined. Also, move most release stablization work from
|
||||
the `release` branch to the `master` branch to reduce backports.
|
||||
|
||||
# Motivation
|
||||
[motivation]: #motivation
|
||||
|
||||
We want to release on time without herculian efforts. Limited
|
||||
restrictions to merging breaking changes to `staging` should avoid the common
|
||||
practice of forcing many, largely-untested, commits into master before
|
||||
branch-off.
|
||||
|
||||
This happened for the 20.09 release in which ~640 staging
|
||||
commits were pushed through in the days leading up to the branch off
|
||||
([#95492](https://github.com/NixOS/nixpkgs/pull/95492),
|
||||
[#96280](https://github.com/NixOS/nixpkgs/pull/96280),
|
||||
[#96437](https://github.com/NixOS/nixpkgs/pull/96437),
|
||||
[#97146](https://github.com/NixOS/nixpkgs/pull/97146)). The last PR included a
|
||||
release blocker fix (introduced in [one of the mentioned
|
||||
PRs](https://github.com/NixOS/nixpkgs/pull/96437)) which delayed the
|
||||
branch-off from 4 Sept 2020 to 7 Sept 2020, and ZHF had to be delayed
|
||||
another day to get a semi-accurate hydra build status. The systemd
|
||||
bump was also largely responsible delaying the release until after the
|
||||
scheduled release date where basic login features in plasma [weren't
|
||||
restored until Oct 5th, a week after the planned release
|
||||
date](https://github.com/NixOS/nixpkgs/pull/99629) and a backlog of
|
||||
other plasma related issues [weren't resolved until Oct 19th, almost a
|
||||
month after the planned release
|
||||
date](https://github.com/NixOS/nixpkgs/pull/101078). This is not to
|
||||
discredit any individual, but demonstrate that certain packages have
|
||||
many dimensions of compatibility which need a longer time to stabilize
|
||||
on unstable before being included in a release.
|
||||
|
||||
|
||||
# Definitions
|
||||
[definitions]: #definition
|
||||
- Breaking change
|
||||
- A change that is likely to break downstream.
|
||||
- For projects following Semantic Versioning, major version bumps indicate breaking changes.
|
||||
- Restricted
|
||||
- Breaking changes are disallowed.
|
||||
- Breaking changes for security or critical bugs are allowed. (Patching is preferred over updates.)
|
||||
- New packages and NixOS modules are welcome.
|
||||
- Unrestricted
|
||||
- Breaking changes are allowed.
|
||||
- New packages and NixOS modules are welcome.
|
||||
- ZHF: Zero Hydra Failures
|
||||
- Period in which packages are stabilized in preparation of a release.
|
||||
|
||||
# Changes
|
||||
|
||||
## Release Critical Packages
|
||||
|
||||
A list of Release Critical Packages will be maintained in the
|
||||
[release wiki](https://nixos.github.io/release-wiki/).
|
||||
Release Critical Packages are important packages which have
|
||||
many dimensions of build or runtime behavior. Generally these will be
|
||||
packages which are a part of `stdenv`, or bootstrapping a system
|
||||
(e.g. systemd).
|
||||
|
||||
Changes to the list will not require additional RFCs, and will occur
|
||||
through the release team. Likely through a release retrospective
|
||||
and/or pull request process to the release wiki.
|
||||
|
||||
## Restriction Timeline
|
||||
|
||||
This timeline represents when certain branches and packages will be
|
||||
restricted. It is not a complete timeline of all release activities.
|
||||
The actual timeline will still be determined by the Release Managers
|
||||
and may be adjusted as needed. The current position in the timeline
|
||||
will be communicated on Discourse.
|
||||
|
||||
| Weeks from Release | Branches Affected | Events |
|
||||
| --- | --- | --- |
|
||||
| -8 Weeks | | Gnome and Plasma(YY.11) packaging begins |
|
||||
| -6 Weeks | `staging-next`, `staging` | Restrict breaking changes to Release Critical Packages |
|
||||
| -4 Weeks | `staging-next`, `staging` | Restrict all breaking changes: allow only non-breaking updates and Desktop Manager changes |
|
||||
| -3 Weeks | `master` | (Day before ZHF) merge `staging-next` into `master`, prep for ZHF |
|
||||
| -3 Weeks | `master` | Begin ZHF |
|
||||
| -3 Weeks | `master` | Focus on minimizing regressions in PRs targeting `master` |
|
||||
| -2 Weeks | `master` | Merge first `staging-next` fixes into `master`; begin second `staging-next` cycle |
|
||||
| -2 Weeks | `staging` | Unrestrict all breaking changes; new changes will not be present in `master` before branch-off |
|
||||
| -1 Weeks | `master` | Merge second `staging-next` fix cycle |
|
||||
| -1 Weeks | `staging-next` | Unrestrict all breaking changes; new changes will not be present in `master` before branch-off |
|
||||
| -1 Weeks | `master`, `release` | Perform Branch-off, create release channels, create new beta / unstable tags |
|
||||
| -1 Weeks | `master`, `release` | ZHF transitions to "backporting" workflow |
|
||||
| -1 Weeks | `release` | Prepare for release, finish remaining issues |
|
||||
| 0 Weeks | `release` | Release! |
|
||||
| 0 Weeks | | ZHF Ends |
|
||||
|
||||
# Drawbacks
|
||||
[drawbacks]: #drawbacks
|
||||
|
||||
Breaking changes to Release Critical Packages will have to wait a
|
||||
maximum of 4 weeks to be merged into `staging`. Other breaking changes
|
||||
targeting `staging` will have to wait a maximum of 2 weeks to be merged.
|
||||
Staging-next iterations will follow a 1 week
|
||||
development cycle during the release timeline. Breaking changes to
|
||||
Release Critical Packages will not appear in `master` for around 7 weeks
|
||||
(4 weeks being disallowed to be merged to staging, 1 week for last
|
||||
`staging-next` during ZHF, ~2 weeks average in `staging-next`).
|
||||
Pull requests which are able to target master will not be interrupted during a release.
|
||||
|
||||
# Alternatives
|
||||
[alternatives]: #alternatives
|
||||
|
||||
## Maintain the status quo regarding release dates
|
||||
|
||||
Continue with cramming staging changes right before branch-off,
|
||||
keeping a significant amount of stabilization work and risk before a
|
||||
release, and likely continuing the trend of delayed releases.
|
||||
|
||||
# Future work
|
||||
[future]: #future-work
|
||||
|
||||
- Update [release wiki to reflect changes](https://github.com/NixOS/release-wiki)
|
||||
- Inform community about changes (Discourse).
|
||||